An electronic assembly consists of two subsystems,$A$ and $B$. From previous testing procedures,the following probabilities are known:
$P(A \text{ fails}) = 0.2$
$P(B \text{ fails alone}) = 0.15$
$P(A \text{ and } B \text{ fail}) = 0.15$
Evaluate the probability $P(A \text{ fails alone})$.

  • A
    $0.05$
  • B
    $0.10$
  • C
    $0.15$
  • D
    $0.20$

Explore More

Similar Questions

In a city,$20\%$ of the population travels by car,$50\%$ travels by bus,and $10\%$ travels by both car and bus. Then,the percentage of persons travelling by car or bus is......$\%$

Two newspapers $A$ and $B$ are published in a city. It is known that $25\%$ of the city population reads $A$ and $20\%$ reads $B$,while $8\%$ reads both $A$ and $B$. Further,$30\%$ of those who read $A$ but not $B$ look into advertisements,$40\%$ of those who read $B$ but not $A$ look into advertisements,and $50\%$ of those who read both $A$ and $B$ look into advertisements. The percentage of the population who look into advertisements is:

The sum of the integers from $1$ to $100$ which are not divisible by $3$ or $5$ is

The number of elements in the set $\{n \in \{1, 2, 3, \ldots, 100\} \mid (11)^{n} > (10)^{n} + (9)^{n}\}$ is $.....$

$A$ contractor has two teams of workers,team $A$ and team $B$. Team $A$ can complete a project $P$ in $12$ days and team $B$ can complete $P$ in $36$ days. Team $A$ starts working on $P$ and team $B$ joins team $A$ after four days. Team $A$ is withdrawn after another two days and team $B$ is asked to double its efficiency. The number of additional days required for team $B$ to complete $P$ is

Vedclass Products

For Students

Vedclass Test Series

Mock tests in real JEE/NEET style with performance analysis. 5-day free trial.

Start Free Trial
For Teachers

Exam Paper Generator

Generate Set A/B/C/D exam papers from 7.5L+ questions in 2 minutes. 3 chapters free.

Try Free
For Institutes

Online Exam Module

Live online exams with unlimited students, 360° analytics & white-label branding.

See Demo