$A$ string is used to pull a block of mass $m$ vertically up by a distance $h$ at a constant acceleration $\frac{g}{3}$. The work done by the tension in the string is ..............

  • A
    $\frac{2}{3} m g h$
  • B
    $\frac{-m g h}{3}$
  • C
    $m g h$
  • D
    $\frac{4}{3} m g h$

Explore More

Similar Questions

$A$ body of mass $5\, kg$ is placed at the origin and can move only on the $x$-axis. $A$ force of $10\, N$ is acting on it in a direction making an angle of $60^\circ$ with the $x$-axis and displaces it along the $x$-axis by $4\, m$. The work done by the force is $...\, J$.

$A$ force of $5 \ N$ is required to maintain a constant velocity of $2 \ m/s$ for a block of mass $10 \ kg$ on a rough surface. The work done by this force in $1 \ minute$ is: (in $J$)

$A$ block of mass $m$ is kept in an elevator which starts moving downward with an acceleration $a$ as shown in the figure. The block is observed by two observers $A$ and $B$ for a time interval $t_0$. According to observer $B$,the net work done on the block is

Difficult
View Solution

When is the work done by a force positive and when is it negative?

$A$ particle of mass $m$ moves along a circular path of radius $r$ under the influence of a centripetal force $F$. What is the work done when the particle moves along a semi-circular path?

Vedclass Products

For Students

Vedclass Test Series

Mock tests in real JEE/NEET style with performance analysis. 5-day free trial.

Start Free Trial
For Teachers

Exam Paper Generator

Generate Set A/B/C/D exam papers from 7.5L+ questions in 2 minutes. 3 chapters free.

Try Free
For Institutes

Online Exam Module

Live online exams with unlimited students, 360° analytics & white-label branding.

See Demo