At a hydroelectric power plant,the water pressure head is at a height of $300\; m$ and the water flow available is $100\; m^{3} s^{-1}.$ If the turbine generator efficiency is $60\%,$ estimate the electric power available from the plant (in $MW$) $\left(g=9.8\; m s^{-2}\right).$

  • A
    $146.7$
  • B
    $212.6$
  • C
    $176.4$
  • D
    $196.5$

Explore More

Similar Questions

Explain why the roof of a building flies off during a stormy wind.

In the following figure,the flow of liquid through a horizontal pipe is shown. Three tubes $A, B$ and $C$ are connected to the pipe. The radii of the tubes $A, B$ and $C$ at the junction are respectively $2 \ cm, 1 \ cm$ and $2 \ cm$. It can be said that the:

Explain the upward force (dynamic lift) acting on an airplane wing.

Difficult
View Solution

$A$ scent sprayer is based on

The velocity of kerosene oil in a horizontal pipe is $5 \ m/s$. If $g = 10 \ m/s^2$,then the velocity head of the oil will be ....... $m$.

Vedclass Products

For Students

Vedclass Test Series

Mock tests in real JEE/NEET style with performance analysis. 5-day free trial.

Start Free Trial
For Teachers

Exam Paper Generator

Generate Set A/B/C/D exam papers from 7.5L+ questions in 2 minutes. 3 chapters free.

Try Free
For Institutes

Online Exam Module

Live online exams with unlimited students, 360° analytics & white-label branding.

See Demo