At present,a firm is manufacturing $2000$ items. It is estimated that the rate of change of production $P$ with respect to the additional number of workers $x$ is given by $\frac{dP}{dx} = 100 - 12\sqrt{x}$. If the firm employs $25$ more workers,then the new level of production of items is:

  • A
    $2500$
  • B
    $3000$
  • C
    $3500$
  • D
    $4500$

Explore More

Similar Questions

$A$ particle moves along the curve $6y = x^3 + 2$. Find the points on the curve at which the $y$-coordinate is changing $8$ times as fast as the $x$-coordinate.

$A$ point $P$ is moving on the curve $x^3 y^4 = 2^7$. The $x$-coordinate of $P$ is decreasing at the rate of $8 \text{ units per second}$. When the point $P$ is at $(2, 2)$, the $y$-coordinate of $P$:

The volume of a spherical ball is increasing at a rate of $4 \pi \text{ cm}^3 \text{ s}^{-1}$. The rate at which its radius increases,when its volume is $288 \pi \text{ cm}^3$,is ....... $\text{cm s}^{-1}$.

$A$ balloon,which always remains spherical on inflation,is being inflated by pumping in $900 \, cm^3$ of gas per second. Find the rate at which the radius of the balloon increases when the radius is $15 \, cm$.

If a metallic circular plate of radius $50 \, cm$ is heated so that its radius increases at the rate of $1 \, mm$ per hour,then the rate at which the area of the plate increases (in $cm^2/hour$) is (in $\pi$)

Vedclass Products

For Students

Vedclass Test Series

Mock tests in real JEE/NEET style with performance analysis. 5-day free trial.

Start Free Trial
For Teachers

Exam Paper Generator

Generate Set A/B/C/D exam papers from 7.5L+ questions in 2 minutes. 3 chapters free.

Try Free
For Institutes

Online Exam Module

Live online exams with unlimited students, 360° analytics & white-label branding.

See Demo