How much work is done in moving a charge of $2 \, C$ across two points having a potential difference of $12 \, V$ (in $, J$)?

  • A
    $14$
  • B
    $24$
  • C
    $6$
  • D
    $10$

Explore More

Similar Questions

How many electrons will there be in $1.6 \ C$ charge?

$A$ house is fitted with $5$ tubes each of $40 \, W$. If all the tubes are lighted for $20$ hours and if the cost of electrical unit is ₹ $0.50$,the total cost of electricity consumed is (in ₹)

Which electrical appliance with the given rating will draw the maximum current from the source?

What is the direction of conventional current?

$1\, mA = \dots A$

Vedclass Products

For Students

Vedclass Test Series

Mock tests in real JEE/NEET style with performance analysis. 5-day free trial.

Start Free Trial
For Teachers

Exam Paper Generator

Generate Set A/B/C/D exam papers from 7.5L+ questions in 2 minutes. 3 chapters free.

Try Free
For Institutes

Online Exam Module

Live online exams with unlimited students, 360° analytics & white-label branding.

See Demo