The minimum value of $Z = 3x + y$, subject to the constraints $2x + 3y \leq 6$, $x + y \geq 1$, $x \geq 0$, and $y \geq 0$ is:

  • A
    $5$
  • B
    $2$
  • C
    $1$
  • D
    $9$

Explore More

Similar Questions

For the following shaded region,the linear constraints are:

The maximum value of $z = 9x + 13y$ subject to the constraints $2x + 3y \leq 18$,$2x + y \leq 10$,$x \geq 0$,$y \geq 0$ is:

The difference between the maximum and minimum values of the objective function $Z = 3x + 5y$, subject to the constraints $x + 3y \leq 60$, $x + y \geq 10$, $x - y \leq 0$, and $x, y \geq 0$, is

$A$ factory manufactures two types of screws, $A$ and $B$. Each type of screw requires the use of two machines, an automatic and a hand-operated one. It takes $4 \, \text{minutes}$ on the automatic and $6 \, \text{minutes}$ on the hand-operated machine to manufacture a package of screws $A$, while it takes $6 \, \text{minutes}$ on the automatic and $3 \, \text{minutes}$ on the hand-operated machine to manufacture a package of screws $B$. Each machine is available for at most $4 \, \text{hours}$ on any day. The manufacturer can sell a package of screws $A$ at a profit of $Rs. \, 7$ and screws $B$ at a profit of $Rs. \, 10$. Assuming that he can sell all the screws he manufactures, how many packages of each type should the factory owner produce in a day in order to maximize his profit? Determine the maximum profit.

Difficult
View Solution

If $Z = 7x + y$ subject to $5x + y \geq 5$,$x + y \geq 3$,$x \geq 0$,$y \geq 0$,then the minimum value of $Z$ is

Vedclass Products

For Students

Vedclass Test Series

Mock tests in real JEE/NEET style with performance analysis. 5-day free trial.

Start Free Trial
For Teachers

Exam Paper Generator

Generate Set A/B/C/D exam papers from 7.5L+ questions in 2 minutes. 3 chapters free.

Try Free
For Institutes

Online Exam Module

Live online exams with unlimited students, 360° analytics & white-label branding.

See Demo